Project | Year |
PDCS, BANDAR EMAM POWER DISTRIBUTION CONTROL SYSTEM SYSTEM |
2025 |
PDCS, ESLAMABAD GHARB POWER DISTRIBUTION CONTROL SYSTEM |
2025 |
DCS & ESD, CHESHMEH-KHOSH, ZNV ESD & DCS SYSTEM |
2025 |
PDCS, MEHR KHALIJ FARS PETROCHEMICAL Co. POWER DISTRIBUTION CONTROL SYSTEM |
2025 |
BMS & UCP, AGHAJARI 1,4,5, UCP SYSTEM FOR NITROGEN PACKAGE |
2024 |
VOLTAGE MONITORING SYSTEM, ARVAND PETROCHEMICAL Co. VOLTAGE MONITORING SYSTEM |
2024 |
UCP, AGHAJARI UCP, MMS, IPC OF SCREW COMPRESSORS |
2024 |
UCP, ILAM GAS REFINARY UPGRADING UCP SYSTEM FOR GAS COMPRESSOR |
2024 |
PCS & ESD, ISFAHAN OIL REFINARY PCS & ESD SYSTEM FOR HYBRID COOLING TOWER PACKAGE |
2024 |
PDCS, BIBI-HAKIMEH POWER DISTRIBUTION CONTROL SYSTEM SYSTEM FOR FIRE FIGHTING STATION |
2024 |
PDCS, ISFAHAN OIL REFINARY POWER DISTRIBUTION CONTROL SYSTEM FOR FIRE FIGHTING STATION |
2024 |
REMOTE I/O PANEL, CO2 ABSORBER PLANT RIO |
2023 |
CONTROL SYSTEM, SOUTH AZADEGAN OIL FIELD DEVELOPMENT PROJECT PHASE I CENTRAL TREATMENT AND EXPORT PLANT UTLITY AIR SYSTEM CONTROL SYSTEM |
2023 |
BMS, MARUN-3 DEHYDRATION AND GAS COMPRESSION AND PIPELINE BURNER MANAGEMENT SYSTEM |
2023 |
BMS, RAMSHIR DEHYDRATION AND GAS COMPRESSION AND PIPELINE BURNER MANAGEMENT SYSTEM |
2023 |
BMS & UCP, ILAM GAS TREATING PLANT PHASE 2 AND COMPLETION OF PHASE 1 CONTROL SYSTEM |
2023 |
BMS & UCP, PAZANAN-01 COMPRESSOR STATION AND GAS DEHYDRATION WITH PIPE LINE CONTROL SYSTEM |
2023 |
BMS & UCP, AGHAJARI-02 COMPRESSOR STATION AND GAS DEHYDRATION WITH PIPE LINE CONTROL SYSTEM |
2023 |
PDCS, NEGIN SONQOR CHEMICAL INDUSTRIES COMPANY METHYLAMINE PLANT POWER DISTRIBUTION CONTROL SYSTEM |
2023 |
PMS, CHESHMEH KHOSH GAS COMPRESSOR STATIONS POWER MANAGEMENT SYSTEM |
2023 |
PDCS, 5000 MTPD BADR-E-SHARGH METHANOL PLANT |
2023 |
CONTROL SYSTEM, RAGSEFID 1 COMPRESSOR STATION AND GAS DEHYDRATION WITH PIPELINES |
2023 |
PDCS, SALMAN FARSI PETROCHEMICAL COMPANY PROPANE DEHYDROGENATION (PDH) PROJECT POWER DISTRIBUTION CONTROL SYSTEM |
2023 |
PDCS, RAGSEFID 1 COMPRESSOR STATION AND GAS DEHYDRATION, RAGSEFID |
2022 |
PDCS, KANGAN UTILITY & OFFSITE PROJECT (PHASE II) POWER DISTRIBUTION CONTROL SYSTEM |
2022 |
PDCS, HDPE PLANT POWER DISTRIBUTION CONTROL SYSTEM, KANGAN |
2022 |
DCS/ESD/FGS/ PMS, ARDESTAN & DEHSHIR GAS COMPRESSOR STATION CONTROL SYSTEM |
2022 |
DCS, UPGRADING SYSTEM FOR WATER UNIT, KERMANSHAH |
2022 |
BMS, AIR HANDLING UNIT, CONTROL SYSTEM, SAKO DESALINATION PLANT, BANDAR ABBAS PROJECT |
2022 |
BMS, CHESHMEH-KHOSH, DALPARI AND EAST PAYDAR OIL FIELDS DEVELOPMENT PROJECT |
2022 |
DCS/ESD/FGS/ PMS, ARADAN GAS COMPRESSOR STATION CONTROL SYSTEM |
2022 |
JEY OIL FIELD INSTRUMENT , CHABAHAR |
2022 |
TABRIZ/KHOY/ORUMIYEH PIPELINE AND FACILITIES, PLC/ESD |
2022 |
SAKO DESALINATION PLANT, DCS, BANDAR ABBAS |
2021 |
GAS COMPRESSOR STATION ULTRASONIC FLOWMETER , ARADAN – SEMNAN |
2021 |
5MW SOLAR POWER PLANT, PDCS, SEFID DASHT – CHARMAHAL AND BAKHTIARI |
2021 |
SWRO DESALINATION PLANT 2 x 3300 m3/day, KUHESTAK- HORMOZGAN |
2021 |
AIR HANDLING UNIT CONTROL SYSTEM,BIDBOLAND‐IRAN,TAHVIEH Co |
2021 |
AIR HANDLING UNIT CONTROL SYSTEM,ABADAN‐IRAN,TAHVIEH Co |
2021 |
QOM WATER TREATMENT PLANT |
2021 |
SADRA WATER TREATMENT PLANT |
2021 |
KOOSHK 10MW SOLAR POWER PLANT |
2021 |
BWRO DESALINATION CHUEBDEH CITY 2×1500 m3/day |
2021 |
LPG GAS RECOVERY SYSTEM |
2021 |
NGL 1000 GAS PRECOMPRESSION UNIT |
2021 |
Light Naphtha Isomerization (ISOM) & Naphtha Splitter SHIRAZ OIL REFINERY UPGRADING SYSTEM FOR BOILER |
2021 |
SEPAHAN OIL CO. EXPORT TERMINAL CONTROL SYSTEM |
2020 |
AIR HANDLING UNIT CONTROL SYSTEM,BANDAR-E-JASK, TAHVIEH CO |
2020 |
GARMSAR PRODUCTION COMPLEX CALCIUM CHLORIDE SYSTEM CONTROL, GARMSAR, IRAN |
2020 |
POWER DISTRIBUTION CONTROL SYSTEM (PDCS) NGL3100,DEHLORAN, IRAN |
2020 |
AIR HANDLING UNIT CONTROL SYSTEM,TOMBAK, TAHVIEH CO |
2020 |
AIR HANDLING UNIT CONTROL SYSTEM,NGL3100,TAHVIEH CO |
2020 |
AIR HANDLING UNIT CONTROL SYSTEM,SIRAF,TAHVIEH CO |
2020 |
BMS & EMS, MAHYA PROTEIN FOOD INDUSTRIAL COMPLEX |
2020 |
PROCESS CONTROL SYSTEM FOR COC AND ANITARY WASTEWATER TREATMENT UNIT,ASALUYEH, IRAN |
2020 |
CONTROL SYSTEM DERALOUK POWER PLANT |
2020 |
CONTROL SYSTEM FOR SHIRAZ WATER PUMP STATION |
2019 |
CONTROL SYSTEM , SANGAN IRON ORE CONCENTRATE PLANT 5 MTPY TAILING HANDLING SYSTEM |
2019 |
PROCESS CONTROL SYSTEM FOR WATER TREATMENT UNIT, SARNEY, IRAN |
2019 |
GUILAN WATER TREATMENT PROJECT, BRIDGE CONTROL PANEL |
2019 |
PMS & PDCS, TABRIZ REFINERY CO |
2018 |
INSTALLATION OF INSTRUMENT, ELECTRICAL AND TELECOM EQUIPMENT FOR UNIT 72 PERSIAN GULF STAR OIL CO, BANDAR ABBAS |
2018 |
DCS, GILAN WATER TREATMENT PLANT |
2018 |
DCS & ESD, DESALTING UNIT, GHALENAR-KHOOZASTAN |
2018 |
DCS, DALAHOO POWER PLANT, KERMANSHAH |
2016 |
BMS, PARSAM RUBBER PHARMED CO, SAVEH |
2018 |
FGS, GAS PRESSURE REDUCING STATION OF WEST KARUN, AHWAZ |
2017 |
PMS & PDCS, ILAM PETROCHEMICAL CO. SULFUR REMOVAL PLANT |
2016 |
PMS & PDCS, ILAM PETROCHEMICAL CO. OLEFIN PLANT |
2016 |
PMS & PDCS, BUSHEHR PETROCHEMICAL COMPLEX CRPF PLANT |
2015 |
PDCS, GSP & OFFSITE PLANTS, BUSHEHR PETROCHEMICAL COMPLEX |
2015 |
SAS, SARCHESHMEH COPPER INDUSTRIES Co. SUBSTATION AUTOMATION SYSTEM BASED ON IEC61850 OF E20 PROJECT, KERMAN |
2014 |
PDCS, NF3 PRODUCTION PLANT, BANDAR IMAM PETROCHEMICAL COMPLEX, MAHSHAHR |
2012 |
PDCS, ABADAN REFINERY RENOVATION PROJECT |
2011 |
.PDCS, UREA & AMMONIA UNIT OF KERMANSHAH PETROCHEMICAL CO |
2008 |
PDCS, MEG PLANT, MORVARID PETROCHEMICAL COMPLEX |
2015 |
PDCS, UTILITY & OFF‐SITE, UREA AND AMMONIA UNIT SHIRAZ PETROCHEMICAL COMPLEX |
2014 |
PDCS, UREA AND AMMONIA PLANT, PARDIS PETROCHEMICAL COMPLEX |
2015 |
PMS, POWER PLANT, UREA AND AMMONIA UNIT SHIRAZ PETROCHEMICAL COMPLEX |
2014 |
PMS & PDCS, GAT IV GAS COMP. STATION 5 IN ABADEH – SHIRAZ |
2011 |
PMS & PDCS, GAT IV GAS COMP. STATION 7 IN ARSANJAN – SHIRAZ |
2010 |
PMS & PDCS, GAT IV GAS COMP. STATION 8 IN SHAHREZA – ISFAHAN |
2009 |
FAS, UPGRADE OF COMPOUND MIXING PLANT (BANBURY MIXERS), BATCH PROCESS KAVIR TIRE |
2016 |
FAS, UPGRADE OF COMPOUND MIXING PLANT (BANBURY MIXERS), BATCH PROCESS YAZD TIRE |
2015 |
FAS, UPGRADE OF COMPOUND MIXING PLANT (BANBURY MIXERS), BATCH PROCESS DENA TIRE |
2014 |
FAS, UPGRADE OF COMPOUND MIXING PLANT (BANBURY MIXERS), BATCH PROCESS YAZD TIRE |
2006 |
CONTROL SYSTEM, BAHONAR COPPER PIPES FACTORY, KERMAN |
2010 |
CONTROL SYSTEM AND F&G PANEL, FUEL PRODUCTION PLANT ISFAHAN |
2010 |
CONTROL SYSTEM, KAVIAN PETROCHEMICAL CO., MOTOR CONTROL CENTRE |
2009 |
CONTROL SYSTEM, NF3 PRODUCTION PLANT, MOTOR CONTROL SYSTEM, BANDAR IMAM PETROCHEMICAL CO |
2011 |
DCS, MCB/PNCB PLANTS OF CHLORPARS FACTORY, TABRIZ |
2008 |
DCS & ESD, SHANOUL GAS MANIFOLD, LAMERD-FARS |
2007 |
DCS & ESD, TRANSPORT PIPELINES TO DUAL PURPOSED JETTY, LAVAN OIL REFINERY PLANT |
2013 |
DCS, CITY WATER TREATMENT PLANT, ORGENJ-UZBEKISTAN |
2007 |
DCS, RO WATER TREATMENT UNIT OF KHOOZESTAN STEEL CO, AHWAZ |
2007 |
DCS, WATER TREATMENT PLANT (DEMINERALIZED & POLISHED WATER) OF UREA & AMMONIA UNIT FOR KERMANSHAH PETROCHEMICAL CO |
2007 |
DCS, CITY WATER TREATMENT PLANT FOR LARESTAN REGION |
2006 |
DCS, CITY WATER TREATMENT PLANT, ILAM |
2006 |
DCS, WATER TREATMENT PLANT OF UREA AND AMMONIA UNIT, EXTENSION & RENOVATION |
2012 |
CONTROL SYSTEM, FIRE‐FIGHTING WATER SUPPLY OF DUAL PURPOSED JETTY, LAVAN OIL REFINERY PLANT |
2011 |
CONTROL SYSTEM & INSTRUMENTATION, SEMNAN 2ND 3000 MW POWER PLANT, AUXILIARY BOILER |
2011 |
BMS, SOFTGEL PRODUCTION BUILDING, JABER PHARMACEUTICAL CO |
2011 |
BMS, IRAN HORMON PHARMACEUTICAL R&D BUILDINGS |
2015 |
BMS, AFA CHIEME PHARMACEUTICAL CO. PRODUCTION BUILDINGS |
2013 |
BMS, IRAN HORMON PHARMACEUTICAL PRODUCTION BUILDINGS |
2014 |
BMS, TABLET PRODUCTION BUILDING, JABER PHARMACEUTICAL CO |
2012 |
INSTALLATION OF INSTRUMENT, ELECTRICAL AND TELECOM EQUIPMENT, UTILITY & OFF‐SITE, OFF‐SITE AREA OF PERSIAN GULF STAR OIL COMPANY |
2017 |