Project | Year |
DCS/ESD/FGS/ PMS, ARADAN GAS COMPRESSOR STATION CONTROL SYSTEM |
2022 |
JEY OIL FIELD INSTRUMENT , CHABAHAR |
2022 |
TABRIZ/KHOY/ORUMIYEH PIPELINE AND FACILITIES, PLC/ESD |
2022 |
SAKO DESALINATION PLANT, DCS, BANDAR ABBAS |
2021 |
GAS COMPRESSOR STATION ULTRASONIC FLOWMETER , ARADAN – SEMNAN |
2021 |
5MW SOLAR POWER PLANT, PDCS, SEFID DASHT – CHARMAHAL AND BAKHTIARI |
2021 |
SWRO DESALINATION PLANT 2 x 3300 m3/day, KUHESTAK- HORMOZGAN |
2021 |
AIR HANDLING UNIT CONTROL SYSTEM,BIDBOLAND‐IRAN,TAHVIEH Co |
2021 |
AIR HANDLING UNIT CONTROL SYSTEM,ABADAN‐IRAN,TAHVIEH Co |
2021 |
QOM WATER TREATMENT PLANT |
2021 |
SADRA WATER TREATMENT PLANT |
2021 |
KOOSHK 10MW SOLAR POWER PLANT |
2021 |
BWRO DESALINATION CHUEBDEH CITY 2×1500 m3/day |
2021 |
LPG GAS RECOVERY SYSTEM |
2021 |
NGL 1000 GAS PRECOMPRESSION UNIT |
2021 |
Light Naphtha Isomerization (ISOM) & Naphtha Splitter SHIRAZ OIL REFINERY UPGRADING SYSTEM FOR BOILER |
2021 |
SEPAHAN OIL CO. EXPORT TERMINAL CONTROL SYSTEM |
2020 |
AIR HANDLING UNIT CONTROL SYSTEM,BANDAR-E-JASK‐Iran,TAHVIEH Co |
2020 |
GARMSAR PRODUCTION COMPLEX CALCIUM CHLORIDE SYSTEM CONTROL, GARMSAR, IRAN |
2020 |
POWER DISTRIBUTION CONTROL SYSTEM (PDCS) NGL3100,DEHLORAN, IRAN |
2020 |
AIR HANDLING UNIT CONTROL SYSTEM,TOMBAK‐Iran,TAHVIEH Co |
2020 |
AIR HANDLING UNIT CONTROL SYSTEM,NGL3100,TAHVIEH Co |
2020 |
AIR HANDLING UNIT CONTROL SYSTEM,SIRAF,TAHVIEH Co |
2020 |
Mahya Protein Food Industrial Complex BMS / EMS |
2020 |
PROCESS CONTROL SYSTEM FOR COC AND ANITARY WASTEWATER TREATMENT UNIT,ASALUYEH, IRAN |
2020 |
CONTROL SYSTEM DERALOUK POWER PLANT |
2020 |
CONTROL SYSTEM FOR SHIRAZ WATER PUMP STATION |
2019 |
CONTROL SYSTEM , SANGAN IRON ORE CONCENTRATE PLANT 5 MTPY TAILING HANDLING SYSTEM |
2019 |
PROCESS CONTROL SYSTEM FOR WATER TREATMENT UNIT, SARNEY, IRAN |
2019 |
GUILAN WATER TREATMENT PROJECT, BRIDGE CONTROL PANEL |
2019 |
Power Management System (PMS) Tabriz Refinery, Tabriz‐Iran, ODCC Co |
2018 |
Unit 72 Installation of Instrument, Electrical and Telecom Equipment, Hormozgan, IRAN-Client: Petro Sanat Shahid Rajaee |
2018 |
Distributed Control System (DCS) of Guilan WTP, Guilan-IRAN-Client: Guilan-abfar / Client: Tana Energy Group & Zolal Iran |
2018 |
Distributed Control System (DCS & ESD) of GHALEH NAR Desalting unit, khoozastan-IRAN-Client: KITEC-Main / Client; NISOC |
2018 |
Distributed Control System (DCS) of Dalahoo Power plant, Kermanshah-IRAN-Client: ITC-Main / Client: FARAB |
2018 |
Building Management System (BMS) of Parsam Rubber Pharmad, Tehran-IRAN-Client: Parsam Rubber Pharmad |
2018 |
Programmable Logic Controller (PLC) of West Karun Power Plant & Facilities GAS & WATER SUPPLY, Ahvaz-IRAN Client: Jahanpars-Main / Client: PEDEC |
2017 |
Power Distribution Control System (PDCS) of SULFUR REMOVAL Plant, Ilam Petrochemical Complex, Ilam- IRAN |
|
Power Distribution Control System (PDCS) of OLEFIN Plant, Ilam Petrochemical Complex, Ilam- IRAN- Consultant; Nargan |
|
Power Distribution Control System (PDCS) of CRFP Plant, Bushehr Petrochemical Complex, Assaluyeh- IRAN- Consultant; EIED |
|
Power Distribution Control System (PDCS) of GSP Plant – Bushehr Petrochemical Complex, Assaluyeh- IRAN- Consultant; EIED |
|
Substation Automation System (SAS) of E20 Project, Sarcheshmeh Copper Industries Co., Kerman – IRAN- Client; ELECTROKAVIR |
|
Power Distribution Control System (PDCS) of NF3 Production Plant, Bandar Imam Petrochemical Complex, Mahshahr- IRAN , Engineering; NAMVARAN |
2012 |
Power Distribution Control System (PDCS) of Abadan Refinery Renovation Project – Abadan Oil Refinery Plant , Client; ELECTROKAVIR |
2011 |
Power Distribution Control System (PDCS) of Urea & Ammonia Petrochemical Co.,Kermanshah – IRAN , Engineering; NAMVARAN |
2008 |
Power Distribution Control System (PDCS) of MEG Plant, Morvarid Petrochemical Complex, Assaluyeh – IRAN, Consultant; PEDEK |
2015 |
Power Distribution Control System (PDCS) of Utility & Off-site, Urea and Ammonia Petrochemical Complex, Shiraz – IRAN, Consultant -HIRBODAN |
2014 |
Power Management System (PMS) of Urea and Ammonia Plant, Pardis Petrochemical Complex, Assaluyeh – IRAN , Consultant; NAMVARAN DELVAR & HEDCO |
2015 |
Power Management System (PMS) of Power Plant, Urea and Ammonia Petrochemical Complex, Shiraz , Consultant; Hirbodan |
2014 |
Power Management System (PMS) of IGAT IV Gas Comp. Station 5 in Abadeh, Shiraz – IRAN , Main Client; IRAN ITOK |
2011 |
Power Management System (PMS) of IGAT IV Gas Comp. Station 7 in Arsanjan, Shiraz – IRAN , Main Client; IRAN ITOK |
2010 |
Power Management System (PMS) of IGAT IV Gas Comp. Station 8 in Shahreza, Isfahan – IRAN , Main Client; IRAN ITOK |
2009 |
Control & Monitoring System Upgrade of Banbury Lines (Compound Mixing Plant), Kavir Tire Manufacturing Co., Birjand- IRAN |
2016 |
Control & Monitoring System Upgrade of Banbury Lines (Compound Mixing Plant), Yazd Tire Manufacturing Co., Yazd- IRAN |
2015 |
Control & Monitoring System Upgrade of Banbury Lines (Compound Mixing Plant), Dena Tire Manufacturing Co., Shiraz- IRAN |
2014 |
Control & Monitoring System Upgrade of Banbury Lines (Compound Mixing Plant), Yazd Rubber & Tire Manufacturing Co , Yazd- IRAN |
2006 |
Control panels for Material Handling of Bahonar Copper Pipes Factory, Kerman – IRAN (2010)-Client; ELECTROKAVIR |
2010 |
Control System for F&G Panel of Fuel Production Plant, Isfahan Refinery Co., Isfahan – IRAN (2010)- Main Client; IRAN ITOK |
2010 |
Control System of Motor Control Center (MCC-PLC) of Kavian Petro Co., Assaluyeh – IRAN (2009)-Consultant; NARGAN |
2009 |
Control System of Motor Control Center (MCC-PLC) of NF3 Production Plant, Bandar Imam Petrochemical Co., Mahshahr – IRAN , (2011) Consultant; NAMVARAN |
2011 |
Distributed Control System (DCS) of MCB/PNCB plants of Chlorpars Factory, Tabriz – IRAN |
2008 |
Distributed Control System & Emergency Shut Down System (DCS & ESD) of Shanoul Gas Manifold, Lamerd – IRAN , Main client; ARIAPETROGAS |
2007 |
Control & Emergency Shut Down Systems (PLC-ESD) of Transport Pipelines to Dual Purposed Jetty, Lavan Oil Refinery Plant , Lavan Island- IRAN (2013)-Client; PARS SKELEH |
2013 |
Control & Monitoring System of City Water Treatment Plant, Orgenj – Uzbekistan (2007)- Client; SHIMBAR |
2007 |
Control & Monitoring System of Water Treatment Plant (Based on Reverse Osmosis Packages),Khoozestan Steel Co., Ahwaz- IRAN ,(2007)- Client; SHIMBAR |
2007 |
Distributed Control System (DCS) of Water Treatment Plant -Demineralized & Polished Water , Urea and Ammonia Petrochemical Complex, Kermanshah- IRAN (2007)-Client; ANDISHEH ZOLAL / Consultant; NAMVARAN |
2007 |
Control & Monitoring System of City Water Treatment Plant for Larestan Region, Ghir – IRAN (2006)-Client; ANDISHEH ZOLAL |
2006 |
Control & Monitoring System of City Water Treatment Plant, Ilam – IRAN (2006)- Client; SHIMBAR / Consultant; MAHABGHODS |
2006 |
Control System Extension & Renovation of Water Treatment Plant, Urea and Ammonia Petrochemical Complex, Kermanshah – IRAN ,(2012)- Client; ELECTROKAVIR |
2012 |
Control System of Fire-Fighting Water Supply of Dual Purposed Jetty, Lavan Oil Refinery Plant, Lavan Island – IRAN ,Client; PARS SKELEH |
2011 |
Detailed Design and Technical Documentation for Power, Control & Instrumentation of Auxiliary Boiler System ,Semnan 2nd 3000 MW Power Plant, Semnan – IRAN (2011)- Client; KHERAD ENERGY |
2011 |
Building Management System (BMS) of SoftGel Production Building, Jaber-Ebn-Hayan Pharmaceutical Co., Tehran- IRAN Paydar Co |
2011 |
Building Management System (BMS) of R&D Buildings, Iran Hormon Pharmaceutical Co., Tehran – IRAN |
2015 |
Building Management System (BMS) of Production Buildings, Afa Chieme Pharmaceutical Co., Tehran – IRAN |
2013 |
Building Management System (BMS) of Production Buildings, Iran Hormon Pharmaceutical Co., Tehran – IRAN |
2014 |
Building Management System (BMS) of Tablet Production Building, Jaber-Ebn-Hayan Pharmaceutical Co., Tehran- IRAN, Paydar Co |
2012 |
PGSOC off-site AREA Installation of Instrument, Electrical and Telecom Equipment, Hormozgan, IRAN, Client: FALAT-Main / Client:PGSOC |